Dispatch · updated 2026-08-08
How to change the dispatch day in Dumpster Controls
Plan tomorrow, review yesterday, or jump straight to a busy date. The whole board follows the selected day.
- ## Step one day at a time
Use the left and right arrows in the top bar's date navigator. Click the date itself to jump back to today. - ## Jump with "Upcoming:" chips
The summary strip shows chips for future dates that already have assigned tasks, with a count on each. Click a chip to open that day. - ## Pick from a calendar
Click the "Assigned for" header at the top of any driver lane to open a calendar and select any date.
What happens next
- Lanes show that day's stops. Unfinished tasks from earlier dates carry into the board as "LATE" so nothing is forgotten.
- Assigning a task from the pool while viewing a future date schedules it for that date.
Troubleshooting
I assigned a task to the wrong day.
Unassign it back to the pool, switch to the correct day, and assign it again.
Related guides
- How to open and read the Dispatch board in Dumpster Controls
- How to assign a task with drag-and-drop in Dumpster Controls
© 2026 Dumpster Controls. All rights reserved. Made in the USA.