Junk Removal · updated 2026-08-08

    How to mark a junk job complete with photos in Dumpster Controls

    Completion is photo-backed by design: the job cannot be confirmed done without at least one proof photo.

    Before you start

    • The job is not already completed or canceled.
    1. 1

      Open the completion box

      In the job drawer, find "Mark Service Complete" ("Confirm the junk removal job is finished") and click "Confirm Service Completed".

    2. 2

      Upload proof photos

      The prompt "Upload service photos before confirming" offers three slots: "Before Service", "Service Complete", and "Trash in Dumpster". Tap a slot to take or choose a picture. The rule is stated under the grid: "At least one photo is required". Photos are stamped and saved to the job.

    3. 3

      Slide to confirm

      Drag the "Slide to complete" control to the right. (If the slide control is off on your device, a green "Confirm Complete" button appears instead.) A confetti burst and the toast "Service marked as complete!" confirm it.

    What happens next

    • The job status becomes "Completed" with the completion time on the "Activity Timeline", and it counts in the "Completed Today" KPI.
    • The photos join the job's "Photos" section as the service record.

    Troubleshooting

    The slide control will not move.

    It stays disabled until at least one photo is uploaded, with the hint "Add at least one photo first".

    I do not see "Mark Service Complete" at all.

    The box only shows on active jobs. Completed and canceled jobs hide it.

    Related guides

    Still stuck? Talk to our team

    Open a support ticket inside the app and our team will answer there.

    Log in and open a support ticket

    Try it yourself, free

    The software is 100% free with unlimited orders. No credit card, no demo, no contract.

    Create your free account