Dispatch · updated 2026-08-08
How to unassign a task back to the pool in Dumpster Controls
When a driver's day changes, send stops back to "Unassigned Tasks" so they can be re-planned.
Option 1: drag it out
On desktop, drag the card from the driver's lane back onto the "Unassigned Tasks" panel and drop it.
Option 2: use the details drawer
Open the card and click the "Unassign" button under "Task Actions". A toast confirms "Task unassigned".
Option 3: use the assign sheet
Click the card's "Assign" button and choose "Unassign (back to pool)" at the bottom of the "Assign to…" sheet.
What happens next
- The task returns to "Pending" status and shows in the pool under its date section ("Ready for this day", "Scheduled ahead", or "Late").
- The action is recorded in the audit log with who unassigned it.
Troubleshooting
Unassign is blocked.
In route tasks cannot be unassigned; you will see "Task is in progress, cannot reassign". Completed tasks are read-only.
Related guides
© 2026 Dumpster Controls. All rights reserved. Made in the USA.